• Line High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling Machine
  • Line High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling Machine
  • Line High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling Machine
  • Line High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling Machine
  • Line High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling Machine
  • Line High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling Machine

Line High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling Machine

After-sales Service: One Year Warranty
Warranty: One Year Warranty
Certification: CE, ISO
Condition: New
Customized: Customized
Automatic Grade: Semiautomatic
Samples:
US$ 20000/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
  • Overview
  • Detailed Photos
  • Product Parameters
  • Packaging & Shipping
  • Company Profile
  • Our Advantages
  • FAQ
Overview

Basic Info.

Structure
Horizontal
Transport Package
Carton Packaging/Wooden Packaging
Specification
4-12*600/900mm
Trademark
AUGU
Origin
Qingdao
Production Capacity
5pieces/Year

Product Description

Detailed Photos

 

Line High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling MachineLine High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling MachineLine High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling MachineLine High-Efficiency Energy-Saving for Workshops Rubber Sheet Batch-off Cooling Machine

Product Parameters

Items Parameters
Size of rubber sheet 4-12*600/900mm
Power source 380V/50Hz
Conveying speed 40m/min
Hang rubber rod movement speed 0.117-1.17m/min
Max height of handing 1400mm
Axial flow fan motor 0.37Kw
Swing rubber max amplitude(adjustable) 1.3m
Freqyency of swing rubber 13m/min
Rubber sheet temperature field temperature+5°
Gear motor of cooling device 1.1kw
Gear motor of hang rubber rod 2.2kw
Conveyor belt motor 5.5kw
Gear motor of lifting device 3kw
Pressure air 0.4-0.8mpa
Gear motor of under weing rubber 1.1kw

Packaging & Shipping

Company Profile

Our company has many years of production experience and technology accumulation, and is committed to providing customers with high-quality assembly line equipment and high-quality after-sales service.

Our products are well designed and undergo strict quality control and testing to ensure that each assembly line has stable performance, high efficiency and long life. Our assembly lines are widely used in motorcycle tire factories all over the world, especially in Africa and Southeast Asian countries, and are well received by customers.

Our company has a skilled and experienced team, who can provide personalized assembly line solutions according to customer needs, and provide full technical support and services. We always adhere to the "customer first, quality first" business philosophy, and strive to provide customers with the best products and services.

Thank you for your attention to our company, if you have any needs or questions, please feel free to contact us, we will serve you wholeheartedly!

Our Advantages

Carton Packaging/Wooden Packaging

FAQ

 

About machine performance quality
1.       Q:  How to guarantee the quality of outsourcing parts?
          A:  First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q:  Which brand of electric part?
          A:  Use world famous brands, Siemens, Omron, Toshiba, Sch,neider, ABB
Customer can specify the brand.
3.       Q:   How to control the quality?
          A:   There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.

About after-sales service
1.        Q: What is the warranty time?
           A:  1 year after machine arrived at factory
2.        Q:  How to solve the problem?
           A:  Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions.
            1, Which can be solved by phone or Email, it will be solved in two hours.
            2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem).
            3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Management System Certification
ISO 9001, ISO 9000, ISO 14000, QC 080000
Export Year
2017-03-17