This product is no longer promoted on Made-in-China.com. If you find any infringement or sensitive information of it, please contact us for handling. Thank you.
  • Car Tire Motorcycle Tire Wrapping Machinery
  • Car Tire Motorcycle Tire Wrapping Machinery
  • Car Tire Motorcycle Tire Wrapping Machinery
  • Car Tire Motorcycle Tire Wrapping Machinery
  • Car Tire Motorcycle Tire Wrapping Machinery
  • Car Tire Motorcycle Tire Wrapping Machinery

Car Tire Motorcycle Tire Wrapping Machinery

Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
AUGU001
Trademark
AUGU
Origin
Qingdao
Production Capacity
100/Year

Product Description


Introduction

Tire packing machine also called tire wrapping machine ,within multi-function, multiple tires can be wrapped automatically . Both electric motor car tire wrapping machine, motorcycle tire wrapping machine, three rounds car tire wrapping machine, all-steel tire wrapping machine, car tire wrapping machine, solid  tire  wrapping  machine, truck tire wrapping  machine, wire tire wrapping  machine, etc.
Product Show
It can be used for the packaging of various electric cars and motorcycles, the packing belt is elastic and moderate, and the trademark belt can be attached at the same time, and the tire is beautiful and clean after the packing. Packing range: from 8 inches to 22 inches for electric and motorcycle tires.
size KTL-100F
Tire width W≤200mm
Tire outer diameter 350≤OD≤600mm
Tire inner diameter 300≤ID≤500mm
Packing material width70-90mm
Annulus velocity V≤120r/min(frequency conversion)
Roller height 950mm
Roller weighing 100kg
Composite scope At will
Total power 2kw
pressure 380v/50Hz
weight About 300kg




OUR PACKAGE

By stretch then wooden case,or by customer's requirements
OUR SERVICE
1)MOQ: One set.
(2)OEM accept: We can produce as client's demand
(3)Good Quality: We have strict quality control system Good reputation on the market.
(4)Fast and best service Delivery: We have big discount from forwarder (Long Contract).
(5)Processional Design, Self design,efficient production.
(6)Easy operation.
(7)Reasonable price.
Check below for more information on placing an order
(1)Inquiry-Professional quotation.
(2)Confirm the price, lead time, payment term etc.
(3)Sales send the Proforma Invoice with company seal.
(4)Customer makes the payment for deposit and send us Bank receipt.
(5)During Production-send photos to show the production line which you can see your products in. 
Confirm the estimated delivery time.
(1)Clients make payment for balance and Ship the goods.
(2)When machine on your hand and satisfied with them then order is done.
(3)Feedback to us about Quality, Service, Market Feedback & Suggestion. And we can do better.

FAQ
About machine performance quality
1.       Q:  How to guarantee the quality of outsourcing parts?
          A:  First choice more than 2 suppler by tender, There are strict system and process for inspecting outsourcing parts. And there are outsourcing inspectors, after inspection, qualified goods, labeling and storage. Not qualified, return.
2.       Q:  Which brand of electric part?
          A:  Use world famous brands, Siemens, Omron, Toshiba, Schneider, ABB
Customer can specify the brand.
3.       Q:   How to control the quality?
          A:   There are inspectors for inspecting equipment quality and performance, after assembly, machine run continuously for at least 12 hours at one time, Total running time should be not less than 48 hours.

About after-sales service
1.        Q: What is the warranty time?
           A:  2 years after machine arrived at factory
2.        Q:  How to solve the problem?
           A:  Within one hour after getting customer' problem, inform the solution way, there are three ways for different conditions.
            1, Which can be solved by phone or Email, it will be solved in two hours.
            2. Which can be solved by Remote Control, it will be solved within four hours(machine is equipped by Remote Network Control Problem).
            3. Which need solve it on site, engineer arrive at factory within one week(in the two years warranty date, engineer has the visa any time of the country where the machine.





 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company
Management System Certification
ISO 9001, ISO 9000, ISO 14000, QC 080000
Export Year
2017-03-17